top of page

Complete tram system in Pálosvörösmarton

Design and construction of the electrical network of a newly built house so that it can serve future luxury needs (sauna, jacuzzi, e-car charger) without demolition or drilling.

Applied solutions


During the implementation, in addition to serving current needs, we placed great emphasis on preparation:

  • Mains network installation: Complete electrical installation using premium materials.

  • Support for renewable energy: Preparation of the H-tariff at the metering point and professional installation of the heat pump power supply.

  • E-mobility: Preparation of a high-capacity network in the garage suitable for receiving electric car chargers.

  • Wellness focus: Building a secure outdoor and indoor network for later connection of the sauna and jacuzzi.

  • Modern aesthetics: Build custom LED and decorative lighting circuits for a modern feel.

Results
  • Non-demolition expandability: When the sauna or electric car arrives, there is no need to dismantle the walls - just connect the system to the existing circuits.

  • Optimized engineering: The heat pump heating system has a stable and safe electrical supply.

  • Aesthetic home: Design lighting highlights the interior architectural values of the house.

bottom of page